The project involved identification of three alternative corridors for alignment of the powerline from Seoni to Bina in Madhya Pradesh. The tasks involved preparation of a digital database of the topographic features using toposheets and satellite images and plotting the bee-line and three alternate routes. Latest high-resolution satellite data was used for the project. The satellite data was digitally classified to interpret the landuse. A terrain model was created and used for refining the alignments.

Route Alignment for Seoni-Bina 765 kV Transmission Line - 298 kms for PGCIL using Remote Sensing, GPS and DTM Techniques

 

The routes were planned keeping in mind standard practices of avoiding settlements, large water bodies, forest areas, hilly terrains etc as per the standard norms prescribed. This project was carried out in association with M/s Prabhakar Reddy Engineering Consultants for Power Grid Corporation of India Limited.